Skip to main content

Posts

Showing posts from August, 2024

The hearth is done!

We came up today to meet the stone crew who needed to do some final work. We used the opportunity to get a few of our own things done.   The big story: Christina cut the last row of tiles for the hearth and grouted everything in, so now we're ready to place the woodstove!     Jon installed the last leg of wiring for the heat pump: He also put roofing on our woodshed. The chimney repair left over enough scrap metal roofing to do one side of the shed, so from this angle, it matches the cabins. :D  

Hearth

On Saturday Christina tiled the hearth for the woodstove. Meanwhile Jon corrected the placement of a bathroom outlet that interfered with the stone backsplash. (Dang rough-in electrician!) He also did a big dump run and got supplies to complete the wiring to the outdoor heat pump compressor.

Stone countertops

On Wednesday we opened the cabin for the countertop crew from Yakima to install our soapstone countertops. Jon mowed the lawn.