Skip to main content

Posts

Showing posts from June, 2025

Electrical final inspection passed

Sunday I came up to take care of a handful of tiny details before the electrical inspection. Now the utility closet wall is all tidy. I also sanded and varnished the new front door plugs. Monday I got the call from the electrical inspector this morning, so I rushed up to the cabin to be ready. While I waited for his arrival, I completed the downstairs shower trim. The electrical inspection passed, and now we have this lovely sticker.

Hot water, soft water

The last of the closet paint is done, and I installed the water heater! Hooray! Our water filter, softener and UV systems were installed today. I installed a bunch of handles on kitchen and linen closet drawers. I put in the second shower bar.