This weekend was punctuated with little rain squalls, just long enough to get us to stop work on the foundation and move up to the shop before it would break out in sun and cook off the moisture.

Saturday we got the forms stripped off the footer. Hey look at us! We made this thing out of concrete!

 I was the only one here for the pour on Thursday, so I bore the responsibility of carving all of our initials into the footer.


Sunday we carefully re-leveled our batter boards and measured out the outside dimensions of the stem wall, checking for accuracy and square. Then we transferred the string outline down to the footer with a plumb bob.

Finally we got a chance to use our fancy new roto hammer to drill the concrete and screw in some of the metal track for the Quadlock.


Comments

Post a Comment

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."