Starting on the stem wall

This weekend was punctuated with little rain squalls, just long enough to get us to stop work on the foundation and move up to the shop before it would break out in sun and cook off the moisture.

Saturday we got the forms stripped off the footer. Hey look at us! We made this thing out of concrete!

 I was the only one here for the pour on Thursday, so I bore the responsibility of carving all of our initials into the footer.


Sunday we carefully re-leveled our batter boards and measured out the outside dimensions of the stem wall, checking for accuracy and square. Then we transferred the string outline down to the footer with a plumb bob.

Finally we got a chance to use our fancy new roto hammer to drill the concrete and screw in some of the metal track for the Quadlock.


Comments

Post a Comment

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...