The smoke is pretty awful, but the scenery gorgeous tonight.
We left home at 1pm, made three shopping stops, and got started at 4:30pm. We finished the water proofing and drainage boards for the cabin.
We assembled most of the french drain around the foundation, and realized we were a couple pipes short.
Then we went up the hill, said hi to the neighbor, and assembled 100 feet of sleeve to protect the flexible water line.
We cleaned out all the conduits by vacuuming a ball of paper towels though them.
We left home at 1pm, made three shopping stops, and got started at 4:30pm. We finished the water proofing and drainage boards for the cabin.
We assembled most of the french drain around the foundation, and realized we were a couple pipes short.
We cleaned out all the conduits by vacuuming a ball of paper towels though them.
Comments
Post a Comment