Our last day of preparation before backfilling the foundation and trench. Most of the day -- six hours -- were spent applying stucco to the top foot of styrofoam. The dirt will cover just up to the stucco, and the siding will drop down just over the top. This is the band that can stand being up against dirt, but isn't ugly to look at.
We also finished off the french drain.
We assembled another hundred feet of sleeve for the water pipe, and shoved both onto the flexible tubing from either end.
We got our tools picked up and out of the way of the excavator.
It was super smoky in Cle Elum.
We also finished off the french drain.
We assembled another hundred feet of sleeve for the water pipe, and shoved both onto the flexible tubing from either end.
We got our tools picked up and out of the way of the excavator.
It was super smoky in Cle Elum.
Comments
Post a Comment