Putting in the stairs

Back on August 28 we told you that the BA Column was scary. We finally found a framing contractor to come and build the tall bits for us. We spent this weekend preparing.

On the way up, bits of snow in the pass!

When we showed up Friday, the telehandler was there for the construction crew. Eliot used it to snag our personnel lift and place it back into the house.


We needed to get all the tools out of the storage container so the driveway guy can move it out of his way. Using his new forest-road skills (see September 22), Eliot drove several truckfuls up the hill at the back of the property to the shed-let.

Saturday



Meanwhile, Jon worked on building parts for the stairs.


Sunday

Okay, we have the long set of stringers cut. We put in the landing boxes.


Eliot checking my work.


Installing the lower stringers.


The final stairs will have 2x fir that matches the balcony. In the meantime, we cut up leftover materials to make steps that can get beat up during construction.

Here's a fun little timelapse of installing the temporary treads on the stairs.

Stairwell complete!


Throwing sawblades, as you do.


Moving 4x10s out of the way to clear the worksite.


Eliot removed Excalimachete from the Hornet Stump. Clearly he's destined for greatness.


Remember that buck that we saw a few times on the forest camera? He came out and watched us from about 100 yards away on our driveway! He was really relaxed. He must know we're not hunters.



Some of the tools got piled in on a pallet in the forest and covered in leftover house wrap.


One more thing before we go -- or before anybody has to go. We moved the porta-potty away from the driveway project. Eliot was driving the lift; he had the potty extended 20' out on the boom, wobbling


Comments

Popular posts from this blog

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...

Energy efficiency testing

I came up after work to meet Brian, the contractor who is doing our blower door test: In this test, a big fan pumps air out of the house at a prescribed pressure differential, and then the air flow rate is measured in cubic feet per minute, then converted to whole house air changes per hour. The maximum limit is 5.0, and we scored that. Hooray! Brian said that we'd done a pretty solid job sealing the house, especially for an owner-built house; getting extremely tight seals requires careful awareness of the sealing challenges at every stage of construction. Another thing I learned by building a house. While I was up there, I got most of the way through installing a heat pump water heater to comply with energy efficiency requirements I re-discovered when looking up the blower door test requirements. This is all a bit silly. For our application -- a house occupied infrequently -- the on-demand heater is the best efficiency tradeoff, because it has zero standby waste. Unfortunately, th...