Skip to main content

Crawlspace party

Friday


We got back up and got half of the crawlspace covered in plastic, glued down to the footer.




It actually snowed pretty heavily in the afternoon!


Sunday

Got back down to the crawlspace and covered the remainder of the dirt with plastic. Now the crawlspace is "done", so we shouldn't see new mold problems. Still need to have someone come out and extra-murder any mold we missed.


With that wrapped up, we collected a few more final window measurements. I need to get the order in, because they're 6-8 weeks away.


Comments

  1. I just looked at April 2019 pictures. Gigantic progress!

    ReplyDelete

Post a Comment

Popular posts from this blog

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

Appliances and mirrors

In pursuit of being ready for final, I came up and installed the fridge and dishwasher with Jeff. We hung mirrors in the bathrooms.

Fit and finish stuff

Jeff and I worked on repairing the drywall gap in the stairwell and tricky bits of wood trim in that space; sorry, no photos. Christina practiced cabinet knob installation and did some more work adjusting the cabinet doors and drawers. Jeff and Jon got half of the stairwell closet space drywalled. I didn't realize it was a fire code requirement; I had been planning to leave it open to make utility repairs easier. But it's got to be done, and now the difficult parts are.