Skip to main content

Glass success.

Friday


Mike made it back this weekend, and we got to work on the windows.


Look at that, a dozen windows in the front!

We even had enough time to get a lesson on ordinary windows. Here are the kitchen windows going in.

Eliot & Mike were justifiably proud of their work. They got out the big selfie-stick (above) and took the cool shot at the top of this post.



In the evening, Eliot finished up the tree-trimming.

Saturday

We finished up the top layer of flashing on the front windows.



 Then we punched through the back of the house and put in the upper-loft window at the very top....

 ...and the windows in the girls bedroom on the second floor.

While we worked, our plumber Pete came up and finished up the drain & water work in the crawlspace. It looks fantastic.

We quit early today. A puff of tool exhaust blew a chip of sawdust around Eliot's safety glasses and into his eye. The pain hung around a while, and we concluded it must have scratched his cornea. Ow. We went back to the hotel to rest. I treated it with saline that turned out to be contact lens cleaner solution -- thanks, Dr. Bursett, for providing an emergency phone number! Turns out it was a non-emergency, but I felt pretty dumb. A long night's sleep was enough to heal things up.

Sunday


We put in the boys' room windows.



Here we're setting up scaffolding and installing the stairwell windows.


Christina got Siggy started installing pipe insulation in the crawlspace.


Then she worked on oiling the window interior wood trim.


Archery!




The kids cleaned the smudges off the outside of the windows.


Eliot & Siggy bouncing around in the lift.


Back to work! We set the upstairs bathroom window, the last glass on an upper floor.





And then the kids drove the lift down the driveway for the rental company to pick up.

Final score: 23 windows installed, 11 windows and 2 big glass sliding doors to go.


Comments

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...