Let the fenestration begin!

Friday


We fixed up a few details.

 Eliot screwed the hose bibbs into the mounting blocks.

We had a 30" space for the toilet, but the plumber pointed out that after drywall it would only be 29". We cut away a wall and moved it 1-1/4" farther from the toilet.

We needed to rearrange the framing in the showers to accommodate the shower valves we bought.

Vycor Man made an appearance, carrying eight rolls of membrane window flashing in a single load. Jon brought boxes of liquid-applied flashing from Seattle, which is supposed to be the new hotness, but we brought a bunch of Vycor membrane flashing from Marson in case the liquid didn't work well.

Our cherry-picker showed up Friday afternoon. They were out of the 42' lift, so we got a 60-foot model. Eliot drove it up to the house to ready for our framer Mike coming Saturday to help us with the windows.

Saturday

Mike showed up to teach us how to do windows, and to help us understand the mechanics of installing the huge 18-square foot triangle windows 25 feet up.


Up the lift, cutting out the first holes.



Applying the liquid flashing. In the videos, it glides on like margarine on toast. In practice, Mike and Eliot fought with the stuff for hours. It was in infuriating.

Break for snapdragons!



Eventually we gave up on the liquid flashing, and switched to conventional membrane (gooey tape) flashing. After a long day, we had twelve triangle holes cut out, and a whole two windows installed.

After Mike left, we've got this huge lift here; might as well get some stuff done.



We put some spar varnish on the exposed beams way up high.


Eliot trimmed away branches that were too close to the house and posed a (forest) fire hazard.

Eliot took the lift up as high as he could stand. He got up about 35 feet, with a great view of the valley, and a wavy ride from the wind.

Sunday

We were hoping Mike would be back to help us with the big windows, but he had to cancel.

 So we stapled some leftover plastic to protect the gaping holes until next weekend.

 The family came up. Siggy wanted a lift ride!







Siobhan worked on her rope swing.





Christina gave archery lessons, and we took a few shots.


Long weekend. Late night enchiladas in North Bend on the way home.

Comments

Popular posts from this blog

Appliances and mirrors

In pursuit of being ready for final, I came up and installed the fridge and dishwasher with Jeff. We hung mirrors in the bathrooms.

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

First tile

Saturday   Tile! Christina got some tile installed this weekend! Jon was racing ahead trying to get backer board down. I had to finish a couple pieces in the main bathroom before anything could be done. Then I got the laundry room filled in.   Hector and his son Robert came over from Yakima to provide initial tile instruction.   The first step was to get all the tile for the floor laid out and edges cut.   Jon had purchased most of the rest of the Ipe deck surface boards in Seattle this week and hauled them up on the trailer. Each 18 foot board weights fifty pounds! Siobhan helped me unload them and stack them under the eaves. Sunday We came back for another morning of work. Christina got almost done thinsetting the first bathroom floor. Jon finished tuning up the subfloor in the upstairs bathroom and getting the backer rock board installed. Siggy and Jon took another little bite out of the deck, cutting the first five joists.