Let the fenestration begin!

Friday


We fixed up a few details.

 Eliot screwed the hose bibbs into the mounting blocks.

We had a 30" space for the toilet, but the plumber pointed out that after drywall it would only be 29". We cut away a wall and moved it 1-1/4" farther from the toilet.

We needed to rearrange the framing in the showers to accommodate the shower valves we bought.

Vycor Man made an appearance, carrying eight rolls of membrane window flashing in a single load. Jon brought boxes of liquid-applied flashing from Seattle, which is supposed to be the new hotness, but we brought a bunch of Vycor membrane flashing from Marson in case the liquid didn't work well.

Our cherry-picker showed up Friday afternoon. They were out of the 42' lift, so we got a 60-foot model. Eliot drove it up to the house to ready for our framer Mike coming Saturday to help us with the windows.

Saturday

Mike showed up to teach us how to do windows, and to help us understand the mechanics of installing the huge 18-square foot triangle windows 25 feet up.


Up the lift, cutting out the first holes.



Applying the liquid flashing. In the videos, it glides on like margarine on toast. In practice, Mike and Eliot fought with the stuff for hours. It was in infuriating.

Break for snapdragons!



Eventually we gave up on the liquid flashing, and switched to conventional membrane (gooey tape) flashing. After a long day, we had twelve triangle holes cut out, and a whole two windows installed.

After Mike left, we've got this huge lift here; might as well get some stuff done.



We put some spar varnish on the exposed beams way up high.


Eliot trimmed away branches that were too close to the house and posed a (forest) fire hazard.

Eliot took the lift up as high as he could stand. He got up about 35 feet, with a great view of the valley, and a wavy ride from the wind.

Sunday

We were hoping Mike would be back to help us with the big windows, but he had to cancel.

 So we stapled some leftover plastic to protect the gaping holes until next weekend.

 The family came up. Siggy wanted a lift ride!







Siobhan worked on her rope swing.





Christina gave archery lessons, and we took a few shots.


Long weekend. Late night enchiladas in North Bend on the way home.

Comments

Popular posts from this blog

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...

Energy efficiency testing

I came up after work to meet Brian, the contractor who is doing our blower door test: In this test, a big fan pumps air out of the house at a prescribed pressure differential, and then the air flow rate is measured in cubic feet per minute, then converted to whole house air changes per hour. The maximum limit is 5.0, and we scored that. Hooray! Brian said that we'd done a pretty solid job sealing the house, especially for an owner-built house; getting extremely tight seals requires careful awareness of the sealing challenges at every stage of construction. Another thing I learned by building a house. While I was up there, I got most of the way through installing a heat pump water heater to comply with energy efficiency requirements I re-discovered when looking up the blower door test requirements. This is all a bit silly. For our application -- a house occupied infrequently -- the on-demand heater is the best efficiency tradeoff, because it has zero standby waste. Unfortunately, th...