Friday
Drove the lift in and stopped at the bottom of the hill to take this glamour shot.

We installed the second level window head casing on the north wall.
Detailing in the plumbing vent.

Time to take out the trash.
Saturday
My mom came up; niece Bri went for a swing. Bri brought her dog Mozy.
Second layer, east wall. These were all single-cut rectangles; no windows or other details. Hooray!
Sunday
It didn't take long to wrap up the east wall.
We took a lunchtime break to shoot some senior portraits.
...and then back into grubby clothes to work on the third row of siding for the north wall.

We're still missing a few details at the top of the north wall, plus the panels where the front door will go, and the panel on the corner that will get installed after the temporary ground wire is removed. But besides those omissions, that's three walls with siding!
Next weekend: the big window wall on the south side.
It's really coming together.