Yet more electrical

Eliot had his friend Remy join us. They installed the ridiculously-high chandelier and stairwell pendant boxes.



Siggy made a chaise lounge.


 
 
Siobhan shot some bullseyes.

A happy bird family has been nesting in our rafters (and pooping all over the window below it).

Christina installed the exterior receptacles so we could stop dragging extension cords out the front door.


We had pizza at Beau's, and Siobhan finally got to meet the legendary Beau himself.



 

 Christina replaced the leaky outdoor spigot with a nice new one.

Siggy found the biggest piece of wood on the scrap pile and recruited mom to help cut it.



 

Eliot furred in the ceiling over the upstairs shower and toilet to make space for the vent fan and can lights.


 

 

Christina installed the vent fan in the newly-furred ceiling.

 

Eliot and Siggy rode the elevator.

 

Christina installed some lighting branch wiring.

Wheeee! Last big swing before a windstorm disassembled our 19-foot tree swing.


We had a nice family lunch in the shedlet.


 

Comments

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."