If you liked all that inside wood, you're going to love doing it again outside!
November 5-8 we got started putting the same tongue and groove material up for our soffits -- the exterior ceiling that covers the rafters.
On Sunday we finished the west overhang.
There two little gaps that needed to be filled, so Jon made just the right pieces of wood and painted them to match the siding. That wrapped up a four-day long weekend.
Two weeks later, we put in another couple days. Saturday we arrived to find our worksite -- and materials -- covered in snow.
We got the east overhang mostly finished. Jon had ordered enough extra bundles of material to definitely be able to finish, plus two more bundles besides, but as we got closer, things were looking dicey. The exterior layout was producing a lot more waste than he had planned on.
There were a few inches of snow on the ground. Our Genie lift had four-wheel drive, but that didn't mean it didn't slide in the snow. That was exciting!
On Sunday we finished up the last few courses, installing the fire-resistant metal vent strips. Thankfully, we just barely had enough wood!