Soffits and vents

If you liked all that inside wood, you're going to love doing it again outside!

November 5-8 we got started putting the same tongue and groove material up for our soffits -- the exterior ceiling that covers the rafters.


The first day was a slow setup day; we got one side of the front section done, and the other just started. Jon stayed late and finished up the other side -- once we had the rhythm it went pretty fast.





The second day brought snow.




We finished the north end and started down the west overhang, which is a little shorter than the other.
 
On Sunday we finished the west overhang.


On Monday we got started on the bigger east overhang.

 
There two little gaps that needed to be filled, so Jon made just the right pieces of wood and painted them to match the siding. That wrapped up a four-day long weekend.



Two weeks later, we put in another couple days. Saturday we arrived to find our worksite -- and materials -- covered in snow.


 
We got the east overhang mostly finished. Jon had ordered enough extra bundles of material to definitely be able to finish, plus two more bundles besides, but as we got closer, things were looking dicey. The exterior layout was producing a lot more waste than he had planned on.

There were a few inches of snow on the ground. Our Genie lift had four-wheel drive, but that didn't mean it didn't slide in the snow. That was exciting!
 
 
On Sunday we finished up the last few courses, installing the fire-resistant metal vent strips. Thankfully, we just barely had enough wood!




On Tuesday Jon drove to Yakima to accept delivery of the vertical-grain fir cabinets into a storage facility. Twenty-five boxes. Aren't they beautiful?









Comments

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...