 We needed to install a new hatch door for the crawlspace. We had a huge opening for installing the HVAC equipment. We made a new door with a smaller people-hatch in it so it would be easy to enter the crawlspace without lifting an 80 pound panel.




Siggy planted this dead tree.



We re-routed the dehumidifier hose to the indoor drain.


We replaced the gasket in our main floor shower pan and re-tested it. It failed.


Sunday
 
We checked the upstairs shower pan, and it passed just fine. Whew.
 
 
 
Siggy drilled a hole in the crawlspace hatch to act as a handle.
 
 

Christina removed masking tape that Jon had left on the wall far too long.


Siobhan filled nail holes with putty and showed Jon how to do the same. Here we're at the 23-foot level, hiding holes in windows where you couldn't have seen them anyway. But we know.
 

Siggy split some firewood into kindling just in time for the burn ban.

 

Christina tackled more masking tape detail work.

 

Siobhan made a nice bouquet for the table (saw).

Jon got the rest of the main room collar ties finished.



Comments

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...