We needed to install a new hatch door for the crawlspace. We had a huge opening for installing the HVAC equipment. We made a new door with a smaller people-hatch in it so it would be easy to enter the crawlspace without lifting an 80 pound panel.
We replaced the gasket in our main floor shower pan and re-tested it. It failed.
Sunday
We checked the upstairs shower pan, and it passed just fine. Whew.
Christina removed masking tape that Jon had left on the wall far too long.

Siobhan filled nail holes with putty and showed Jon how to do the same. Here we're at the 23-foot level, hiding holes in windows where you couldn't have seen them anyway. But we know.

Siggy split some firewood into kindling just in time for the burn ban.
Christina tackled more masking tape detail work.
Siobhan made a nice bouquet for the table (saw).
Jon got the rest of the main room collar ties finished.