Skip to main content

I'm the Stair Master!


Friday


The skirt trim needs to be installed before the stairs; that keeps the pretty finish cuts much simpler.

I spent the whole day carefully measuring and cutting these boards. They're ridiculously expensive pieces of wood; I didn't want to make any mistakes.





Success was getting far enough I could put a first coat of finish on them.


Saturday

Two more coats of finish on the skirts.

While those dried, I installed the last two riser spacers.


I rounded the exposed edge of the car decking floor to help it fit in with the round noses of the oak stair treads that will lead up to it.



I mowed the weeds.


And I saw this little guy. I didn't know we had mantises here! The praying worked; he or she escaped the mower.


Sunday

The skirts are dry, so they got installed.



I made pieces of trim that go where treads and risers need to abut them, and got them finish coated.

I cut and installed most of the risers, excepting the two that should be fit over the landing flooring.


This one riser was warped, which called for an elaborate clamp while the glue dried.


Here are the completed risers on the top section of stairs. You can also see the trim pieces I installed near the top step so the riser could be fit neatly between them.



Tomorrow Doug returns to sand and finish the rest of the floors, which will include installing the stair treads.


Tuesday


Doug sent these photos of the upstairs floors. Looking good!

















Comments

  1. What a giant puzzle. Nice woodworking. Measure a dozen times, cut once! Congrats!

    ReplyDelete

Post a Comment

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...