First tile

Saturday
 
Tile! Christina got some tile installed this weekend!

Jon was racing ahead trying to get backer board down. I had to finish a couple pieces in the main bathroom before anything could be done. Then I got the laundry room filled in.

 

Hector and his son Robert came over from Yakima to provide initial tile instruction.


 

The first step was to get all the tile for the floor laid out and edges cut.


 

Jon had purchased most of the rest of the Ipe deck surface boards in Seattle this week and hauled them up on the trailer. Each 18 foot board weights fifty pounds! Siobhan helped me unload them and stack them under the eaves.



Sunday

We came back for another morning of work. Christina got almost done thinsetting the first bathroom floor.

Jon finished tuning up the subfloor in the upstairs bathroom and getting the backer rock board installed.

Siggy and Jon took another little bite out of the deck, cutting the first five joists.




Comments

  1. Crazy busy! Excited to see the tile going in. Hard workers, ya'll.

    ReplyDelete

Post a Comment

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...