Saturday
Starting in the shop at home, I made a dozen HDPE spacers to put between a sister beam and the ledger I had already installed on the house, to give water a place to escape.
I was greeted at the cabin by the first snow of the season. Yay!
It took a while to pull off all the concrete forms. And then to dig the delivery of pressure treated lumber (beams & joists) out from under the fresh snow pile.
My accomplishment by the end of the day? I got two pieces of wood installed: one beam on the post bases, and the beam I sistered onto the ledge board below the front door.
Comments
Post a Comment