Thursday
Jeff came up to work on trim. Here's the upstairs vestibule, all trimmed out.
After Jeff went home, I dragged the trailer into town to retrieve two sleds from the snowmobile hospital.
Friday
We got through the last of the downstairs trim (except some special fillers I need to make at home), including a couple long-neglected strips at the big french doors.
After Jeff left, I moved the wifi repeater outside to where I'd had another radio mounted. As luck would have it, it had a perfect view of the shed radio, except for a line of three trees in the way.
Comments
Post a Comment