First order of business today was a dump run. Siggy took care of recycling the Gatorade bottles.
Gramma came up to enjoy the woods. Our made-from-garbage picnic benches were such a hit that we decided we needed to make a made-from-garbage picnic table. 23 minutes total completion time.
And here we are enjoying our lunch at our new table!
Siggy sacked out on grandma. Then they headed to her place for a sleepover.
Eliot and I got a second wall segment built.
This one has a particular twist: due to a typo on line 6 of a spreadsheet, we drilled one of our threaded rods into the concrete an inch off from where it needed to be. We corrected the situation by mortising a slot in a post to install the hold-down hardware.
You know the old saying, though. You can't go to bed until you assemble the bed.