Now that the little shed has a floor, we can add a fridge. Here's the delivery guy.
Cold water! Burritos! Yogurt! Mmm.
Okay, back to work. This wall segment is W2: among other things, the plywood gets nails every two inches! That's a lot of nails.
Eliot took the mover dollies for a stroll.
Jon installed two crawlspace vents.
The gathering room side wall is up.
Here's the front door!
Hey, it works!
Installing the front door section.
Comments
Post a Comment