Skip to main content

Current events

Saturday

 
Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people.


Another dump run.


David worked on the pantry for the shedlet.


We had to install one panel of siding so the meter base would end up on top of it.


Dan & Eliot preparing the meter base and panels for dry fitting.



Meter base is mounted; fitting the conduit.

Sunday


Preparing and installing the service entrance conductors.

A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week!


This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem.


Meter base installed and wired to panels!


Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concrete is enough to create a much better electrical connection to the earth than other grounding techniques, like a rod pounded into the soil.


Having finished the panel install, we took measurements so Jon could order siding for next weekend.




On the drive home, we took a two hour detour that replaced 24 miles of freeway with a winding path up through forest service roads. We climbed switchbacks up to 4400' (1300 feet above the pass elevation), and enjoyed stunning panoramas of Keechelus Lake and Mount Rainier.



The mountain wildflowers came in a dizzying array of colors!



Comments

  1. Jon,

    Great work!! With all that done there is someone new to send you a bill.

    DC

    ReplyDelete
  2. Such a wonderful opportunity!! Thank you so much for including us in your cool project!

    ReplyDelete
  3. Such a wonderful opportunity!! Thank you so much for including us in your cool project!

    ReplyDelete

Post a Comment

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...