Current events

Saturday

 
Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people.


Another dump run.


David worked on the pantry for the shedlet.


We had to install one panel of siding so the meter base would end up on top of it.


Dan & Eliot preparing the meter base and panels for dry fitting.



Meter base is mounted; fitting the conduit.

Sunday


Preparing and installing the service entrance conductors.

A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week!


This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem.


Meter base installed and wired to panels!


Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concrete is enough to create a much better electrical connection to the earth than other grounding techniques, like a rod pounded into the soil.


Having finished the panel install, we took measurements so Jon could order siding for next weekend.




On the drive home, we took a two hour detour that replaced 24 miles of freeway with a winding path up through forest service roads. We climbed switchbacks up to 4400' (1300 feet above the pass elevation), and enjoyed stunning panoramas of Keechelus Lake and Mount Rainier.



The mountain wildflowers came in a dizzying array of colors!



Comments

  1. Jon,

    Great work!! With all that done there is someone new to send you a bill.

    DC

    ReplyDelete
  2. Such a wonderful opportunity!! Thank you so much for including us in your cool project!

    ReplyDelete
  3. Such a wonderful opportunity!! Thank you so much for including us in your cool project!

    ReplyDelete

Post a Comment

Popular posts from this blog

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

Appliances and mirrors

In pursuit of being ready for final, I came up and installed the fridge and dishwasher with Jeff. We hung mirrors in the bathrooms.

Fit and finish stuff

Jeff and I worked on repairing the drywall gap in the stairwell and tricky bits of wood trim in that space; sorry, no photos. Christina practiced cabinet knob installation and did some more work adjusting the cabinet doors and drawers. Jeff and Jon got half of the stairwell closet space drywalled. I didn't realize it was a fire code requirement; I had been planning to leave it open to make utility repairs easier. But it's got to be done, and now the difficult parts are.