Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people.


Another dump run.


David worked on the pantry for the shedlet.


We had to install one panel of siding so the meter base would end up on top of it.


Dan & Eliot preparing the meter base and panels for dry fitting.



Meter base is mounted; fitting the conduit.

Sunday


Preparing and installing the service entrance conductors.

A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week!


This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem.


Meter base installed and wired to panels!


Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concrete is enough to create a much better electrical connection to the earth than other grounding techniques, like a rod pounded into the soil.


Having finished the panel install, we took measurements so Jon could order siding for next weekend.




On the drive home, we took a two hour detour that replaced 24 miles of freeway with a winding path up through forest service roads. We climbed switchbacks up to 4400' (1300 feet above the pass elevation), and enjoyed stunning panoramas of Keechelus Lake and Mount Rainier.



The mountain wildflowers came in a dizzying array of colors!



Comments

  1. Jon,

    Great work!! With all that done there is someone new to send you a bill.

    DC

    ReplyDelete
  2. Such a wonderful opportunity!! Thank you so much for including us in your cool project!

    ReplyDelete
  3. Such a wonderful opportunity!! Thank you so much for including us in your cool project!

    ReplyDelete

Post a Comment

Popular posts from this blog

Appliances and mirrors

In pursuit of being ready for final, I came up and installed the fridge and dishwasher with Jeff. We hung mirrors in the bathrooms.

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

First tile

Saturday   Tile! Christina got some tile installed this weekend! Jon was racing ahead trying to get backer board down. I had to finish a couple pieces in the main bathroom before anything could be done. Then I got the laundry room filled in.   Hector and his son Robert came over from Yakima to provide initial tile instruction.   The first step was to get all the tile for the floor laid out and edges cut.   Jon had purchased most of the rest of the Ipe deck surface boards in Seattle this week and hauled them up on the trailer. Each 18 foot board weights fifty pounds! Siobhan helped me unload them and stack them under the eaves. Sunday We came back for another morning of work. Christina got almost done thinsetting the first bathroom floor. Jon finished tuning up the subfloor in the upstairs bathroom and getting the backer rock board installed. Siggy and Jon took another little bite out of the deck, cutting the first five joists.