Yesterday we moved slowly, installing only maybe seven pieces of lumber, as we carefully measured and prepared rim joists. Today we cashed in on that investment.
We installed all the 2x joists for the upstairs bedrooms and bathroom, as well as half of the 4x exposed, cantilevered beams that form the balcony.
Glamour shots. Looking up at the balcony beams overhanging the gathering room.
The moon had a rainbow tonight.
Level 2, here we come!
ReplyDelete