Dried in! Window framing. Chimney.

So the really big news is from last Friday: the framers completed the plywoodr sheeting, and the roofer came up and got the 'ice & snow' synthetic roof felt down over it.

This is exciting: the roofers will be back in a week or two with metal, but it'll be raining by then. Because the wood is protected, they can go ahead with the metal anyway. Yay!

Monday

The framers continued on to frame out the fancy triangle windows in the front. Wow, it looks good!



You had to be there Monday. By Tuesday it was all covered up with plywood, in preparation for housewrap, which protects the sides of the structure from water through the winter -- or however long until we install windows and siding.

Tuesday

I came up tonight to sleep here for a plumber meeting in Ellensburg tomorrow morning. I used the visit to do a few errands: put diesel in the forklift, move some tools down to the house, and fix up one erroneous hold-down strap before the tyvek covers it.

Then I got down to business preparing the chimney and its support box that has to get fastened into the roof before the roofers add metal.




Nice.

Comments

Post a Comment

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."