Grinding away at the front facade trim

 


We attached about seven pieces to the house this weekend. Fancy trim is hard work.


We installed this second diagonal trim board.


We put up vertical trim on either side of the doors so we could get on to putting in fiber cement siding panels.



Siggy made a sign for the archery range and a model house.




Guinivere made some of the diagonal trim that will go in the middle of the design.


Siobhan is priming one of the upper diagonal trims that we need in place before installing siding panels.

 


Siggy, Guinivere and Siobhan slept at the shedlet with dad.

Sunday



Christina and Eliot installed the two lower siding panels. Eliot flashed the seam.


Jon and Christina manufactured more of the middle trim panels. These panels took a lot of test fitting and trim cycles. After that, they each get a dozen rip cuts to make reliefs to go around the window edge profiles and nailing flanges. Then more hand-cut reliefs for lumpy sections of waterproofing tape.


Once the thing finally fits in place, it gets bondo wood filler to fill the knots and defects, sanded, and primed. We finished these five boards on Sunday, but left them inside the house to dry. They'll go up next weekend.


Jon and Eliot wrestled the second layer of siding panels into place.


Siggy made a giant sign from scrap lumber. After he left, Eliot worked on painting it. We've not really found a consensus yet on the cabin's name, but Eliot's trying to make the name Fjelllund a fait acompli. I'm pretty sure it's Sanskrit for "porta potty."

Comments

  1. Hard work! I'm especially impressed with the flower boxes on the model house. <3

    ReplyDelete

Post a Comment

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."