Grinding away at the front facade trim

 


We attached about seven pieces to the house this weekend. Fancy trim is hard work.


We installed this second diagonal trim board.


We put up vertical trim on either side of the doors so we could get on to putting in fiber cement siding panels.



Siggy made a sign for the archery range and a model house.




Guinivere made some of the diagonal trim that will go in the middle of the design.


Siobhan is priming one of the upper diagonal trims that we need in place before installing siding panels.

 


Siggy, Guinivere and Siobhan slept at the shedlet with dad.

Sunday



Christina and Eliot installed the two lower siding panels. Eliot flashed the seam.


Jon and Christina manufactured more of the middle trim panels. These panels took a lot of test fitting and trim cycles. After that, they each get a dozen rip cuts to make reliefs to go around the window edge profiles and nailing flanges. Then more hand-cut reliefs for lumpy sections of waterproofing tape.


Once the thing finally fits in place, it gets bondo wood filler to fill the knots and defects, sanded, and primed. We finished these five boards on Sunday, but left them inside the house to dry. They'll go up next weekend.


Jon and Eliot wrestled the second layer of siding panels into place.


Siggy made a giant sign from scrap lumber. After he left, Eliot worked on painting it. We've not really found a consensus yet on the cabin's name, but Eliot's trying to make the name Fjelllund a fait acompli. I'm pretty sure it's Sanskrit for "porta potty."

Comments

  1. Hard work! I'm especially impressed with the flower boxes on the model house. <3

    ReplyDelete

Post a Comment

Popular posts from this blog

Appliances and mirrors

In pursuit of being ready for final, I came up and installed the fridge and dishwasher with Jeff. We hung mirrors in the bathrooms.

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

First tile

Saturday   Tile! Christina got some tile installed this weekend! Jon was racing ahead trying to get backer board down. I had to finish a couple pieces in the main bathroom before anything could be done. Then I got the laundry room filled in.   Hector and his son Robert came over from Yakima to provide initial tile instruction.   The first step was to get all the tile for the floor laid out and edges cut.   Jon had purchased most of the rest of the Ipe deck surface boards in Seattle this week and hauled them up on the trailer. Each 18 foot board weights fifty pounds! Siobhan helped me unload them and stack them under the eaves. Sunday We came back for another morning of work. Christina got almost done thinsetting the first bathroom floor. Jon finished tuning up the subfloor in the upstairs bathroom and getting the backer rock board installed. Siggy and Jon took another little bite out of the deck, cutting the first five joists.