Not a lot of completed work to show for the weekend; we're mostly getting things ready for later work and later fun.
A delivery of 300 prefinished tongue and groove boards showed up Friday. We loaded it into the house and turned on some electric heat to bring everything up to a stable temperature.
Our garbage pile had grown pretty huge, so we hooked up the big trailer and loaded it up with literally a ton of trash.
We also managed to give away some better leftovers on Craigslist.
That was to prepare for Sunday's adventure. Christina had found a couple pretty nice snowmobiles on Craigslist. We pulled the trailer to Federal way to pick them up, then drove back up to the cabin to park them until the snow catches up with us.
Comments
Post a Comment