Friday

Siggy installed pretty LEDs in the fixtures.


Saturday

Dump run! Siggy and Jon cleared out the storage container to make room for all the tools and materials left in the cabin.

 

Christina and Guinivere moved not-yet-installed light fixtures to the crawlspace.


 

Jon pulled the protective OSB off the balcony car-decking floor.


 

Christina cleaned up the subfloors.


 

Christina and Siggy began the work of finding and sinking screws that were standing proud of the subfloor surface.


 

Guinivere and Siggy touched up the paint in places where Jon had splattered finish while working on the collar ties. (Wish I'd masked.)



 Sunday 

Guinivere worked on cleaning the subfloors more, which involved cleaning the vacuum cleaner filter, too.


 
Jon and Guinivere cleaned the big windows.
 

Guinivere made dropcloth ballgowns for the chandeliers to protect them from sanding dust. She named them Chanderella.



 
We loaded all the tools and scaffolding back into the freshly-organized storage container.
 
 
 Guinivere, Siggy, and Jon spent much of the day sinking subfloor screws and replacing ones that had failed.



 
Siggy wired up the dryer outlet to supply 240V power for the floor sander.
 

 
Siggy locked up the gate and we went home to rest and prepare for our cross-country trip to see Eliot.




Comments

Post a Comment

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."