Wrapping up trim details

Tuesday
 
Jon came up alone on vacation to wrap up more stuff before clearing the building for flooring. I installed the ceiling trim strips Siggy and I made on the weekend:
 
Here's a finished product:
 
 Wait, gotta stop and change the oil in the air compressor.
 


 


 Oop, found some more blue tape still lurking in the upper loft.


The last two pieces of exterior trim were lying around in the laundry room; I nailed those on next to the front door.


Wednesday

I cut this leftover bottom plate out of the bathroom door.

The next big undertaking was wrapping up the exposed wood ceiling in the bathroom and vestibule upstairs. That involved applying a bunch of finish overhead, a task I detest. Lots of drips and finish running down the brush and down your arm. And it's really tricky getting the finish into that little gap between the collar ties.

I had to make four pieces of blocking to complete the look.


This little Douglas Squirrel considered paying us a visit.


 

Thursday

My mom came up to enjoy the scenery. She cut some plywood circles for her birdhouses from our scrap pile.



I trimmed out the drywall for the blocks and fastened them in.


The final result looks pretty great.

I also added a second coat of finish to the collar ties in the boys' bedroom, wrapping up that room.

Tim from Marson came by in his forklift to remove the 870-pound personnel lift from the house. Off it goes to Craigslist.



Comments

  1. Some of "us" are more productive than others. Especially when you consider that I made 4 cuts and quit. Thanks for taking time out to do these.

    ReplyDelete

Post a Comment

Popular posts from this blog

The trim finishing journey begins

The last time we installed wood trim (almost two years ago!), we sanded and cut the material inside the cabin (it was winter) and installed it unfinished. Finishing it meant taping everything off and applying three coats of finish in place. Removing the masking was frustrating (the finish glued it to the wall in places), and in other places the finish still got where it didn't belong. Now the cabin is full of nice, finished floors, cabinets, and counters. It's not a shop. So this time, I'm sanding and pre-finishing all the boards outdoors. Thankfully, there's still pretty nice weather; that black tarp garage heats up pretty well when the sun's out. Today I got the first batch of wood sanded and a coat of finish applied. Christina installed eight receptacles in the kitchen and great room. My mom came up to enjoy the warm ambiance of the not-yet-active wood stove.

Uncrating the wood stove

  I drove up to the cabin today to meet a tree contractor. Since I was up there anyway, I took care of some other business. I got the wood stove out and ready to install on Monday. I vacuumed up the tiny particles of styrofoam packaging material from last year's roofing panels that would have been much easier to clean up last year. I put the bathroom outlet back into its adjusted place above the backsplash. I corrected my installation of the heat pump wiring with a pair of reducing washers. Now it's really done. I replaced the emergency brake battery system in the flatbed trailer.  I bucked a bunch of old logs into rounds for firewood.

Odds and ends

I made progress on a bunch of little things today.  I painted a fencepost in 12" segments and pounded it in at the property line, where the outdoor camera can see it. Now we can measure the snow accumulation. I worked on finishing up almost-complete receptacle branch circuits. The first one I worked on was a little mystery: all the receptacles were installed, but the power didn't reach past a certain point in the line. After some investigation with a wire tracer and watching through the videos we took before covering the walls, I worked out what had happened: two receptacles shared a stud bay, facing into opposite rooms. The plan had been to bring power up to one box, jump over to the other box, and continue back down to the crawlspace to the next box. We forgot the jumper. I couldn't fish a wire between the boxes myself, so that repair waits. Upstairs, installing two receptacles completed the branch. The bathroom vent hole in the tile backer board was a skosh too small. ...