I made a trip up today. I drilled and tapped the gate post to install key lockboxes. One is a combo lock for guests and contractors. The other is a Knox box for the fire department. This lets us complete a permit inspection.



I found one log that didn't make it onto the firewood truck. I chopped it up with the chainsaw, which is how I learned that ice holds dirt in place and rapidly dulls the chain. Darn.

Most of the time I spent today -- five hours -- was spent getting the hodge-podge network situation back to mostly-working. The 5GHz wifi link down to the big cabin only moves a paltry 1.7Mbps, but it's enough that the crawlspace temp and humidity monitor device can finally connect to the backend database again. The forest camera is working again, too!

 
Before I left, I put a fourth and final coat of finish on the closet floor.
 

 

Comments

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."