I had a plumber out to do a bit of work I found too challenging or that needed Pex tools I don't own. He replaced a faulty master shutoff valve, spliced in the water heater hookup, attached the back spigot, and sorted out the tight drain plumbing under the kitchen sink.
Meanwhile, Jeff and I got the rest of the faucets installed.
We installed the mounting hardware for the under-cabinet light strips.
We painted the big stove vent pipe to reduce its visual impact.
I replaced the bathroom receptacles with GFCIs.
Comments
Post a Comment