Today Jon installed the remaining four smoke detectors (the upper loft one got taken care of with the other upper loft stuff)...
...screwed in the last receptacle in the upper loft (now that the mud repair is dry), and installed five light fixtures and three light switches in the upstairs bedrooms and foyer.
There are only a handful of electrical bits left to sort out, in particular the lighting over the kitchen cabinets.
Back on Saturday, at home, I cut out a bunch of chamfered fill strips; those got finish applied on Sunday before and after my trip to the cabin.
Comments
Post a Comment