Skip to main content

The drill adventure begins

Today started with a lot of learning about how much I didn't know.

First, I waited far too long to crack open our window quote, and learned that the proposed window sizes were all different than specified by the architect, to fit into standard sizes. The thing would have looked ridiculous. But we need to know the window sizes to finalize post locations, which affects exactly where we drill giant holes in the foundation.

Second, the rental shop said their hammer drill bits weren't good for rebar. Wut? All my little ones claim to be! Hmm. So we didn't rent.

But all of this stuff is on the critical path!

For the windows, we called all over tarnation and found a lumberyard with a window rep on staff on Saturday. We dropped off our plans with him, and hit the road.

As Eliot drove up to Cle Elum, I spent an hour browsing the Internet to find drill bits that can eat rebar and are long enough to do our ridiculous job. I never quite found the right things, and already had $500 of stuff in my cart.

In Cle Elum, we found drill bits that were supposed to be good for rebar, that were about 3" shorter than we need. We realized that we could drill most of the holes, then do the last 3" (which won't have rebar) with rental equipment later.

And then the window quote came in, with all the windows the right size! So we went from no numbers and no tools, to plenty of work to do.

Siggy brought his bike.

...and looked for frog holes.


When we arrived, this turkey was leading us around slowly.



After we left her alone, she gathered up a dozen chicks and led them away. Cute! The photo is terrible, but some of those blobs are cute little chicks.

Eliot and Calvin got the HVAC pad forms done, and got rebar ready to go in the other forms.



I spent five hours at a desk, carefully measuring out the locations of the 20 holes we need to drill in the foundation. Then measuring, and re-checking those results again. I'm pretty sure they're right.


Eat, drink, and be merry, for tomorrow we drill concrete.

Comments

Post a Comment

Popular posts from this blog

It is DONE!

The final inspection was today. This guy is Levi, the county inspector, and as you can see, we passed! He only had two questions for me. One was about the energy efficiency credits and the blower door test, for which I had the compensating paperwork for the low-flow faucets already prepared. The second was asking for a smoke detector outside the bedroom; I pointed up and he saw that we already had one tucked into the alcove. And that was that! I got up at 5am to be certain I'd be here before the inspector, and I was ... by about five hours. In that time, I took another truckload of tool buckets down to the storage container, then picked up all the floor protection in the great room and vacuumed and mopped. It's glowing! Then I went back down to the storage container to get a hammer so I could glue in 32 wood plugs to cover the screws for the french doors. I fought with installing the screens, but the frames are too big! The manufacturer said "yeah we don't even make th...

Appliances and mirrors

In pursuit of being ready for final, I came up and installed the fridge and dishwasher with Jeff. We hung mirrors in the bathrooms.

First tile

Saturday   Tile! Christina got some tile installed this weekend! Jon was racing ahead trying to get backer board down. I had to finish a couple pieces in the main bathroom before anything could be done. Then I got the laundry room filled in.   Hector and his son Robert came over from Yakima to provide initial tile instruction.   The first step was to get all the tile for the floor laid out and edges cut.   Jon had purchased most of the rest of the Ipe deck surface boards in Seattle this week and hauled them up on the trailer. Each 18 foot board weights fifty pounds! Siobhan helped me unload them and stack them under the eaves. Sunday We came back for another morning of work. Christina got almost done thinsetting the first bathroom floor. Jon finished tuning up the subfloor in the upstairs bathroom and getting the backer rock board installed. Siggy and Jon took another little bite out of the deck, cutting the first five joists.