Big window interior trim

 Jon and Jeff got back to work on Friday, moving back inside now. Good thing, because outside was snowy.


We started on the upper windows, left side. It took all day to get set up and then install six whole pieces of wood. But they look fantastic. Three of the pieces are narrow "quarter round" strips, but instead of boring old round, which wouldn't fit with the cabin's geometry, we manufactured 45-degree chamfered pieces. They look wonderful.They don't really show up in the photos.


On Saturday, we got the same treatment done to the upper right pair of windows, all before lunch. Then we moved down to the big group of four.


They're not quite done yet -- we still need the chamfered strips -- but they look really good so far.

 It's slow going, but the pieces all fit very well, even the ones 25 feet up that require an elevator to examine. When I was sanding saw marks out of the chamfered strips, I was thinking "is this good enough? Well, what if my woodshop teacher ever visits?" Keep sanding.

Comments

  1. Good motivation! Looks wonderful. I will go up in the elevator to examine it.

    ReplyDelete

Post a Comment

Popular posts from this blog

Current events

Saturday   Dan rode up with Eliot and I; Christina brought David, JJ, Peter, and Hannah. Lunch was eleven people. Another dump run. David worked on the pantry for the shedlet. We had to install one panel of siding so the meter base would end up on top of it. Dan & Eliot preparing the meter base and panels for dry fitting. Meter base is mounted; fitting the conduit. Sunday Preparing and installing the service entrance conductors. A shout out to my friend Brett who spent a few hours on the phone talking electrian-shop this week! This panel/meter layout and conduit routing was Eliot's solution to our panel placement problem. Meter base installed and wired to panels! Panels bonded & grounded to Ufer ground. An Ufer ground is basically rebar near the bottom of the concrete foundation that's continuous up through an access stub where it can be wired to the panel. Remarkably, the moisture in the concr...

A really big hole

The excavation team came today.  Paul, the excavator driver, helped Siggy scoop and dump the bucket. Then he taught Eliot how to drive and set him loose: The crew did get the foundation hole dug: Meanwhile, much of the family got a good start on painting the shop:

Getting going on electrical

Today we met with an electrician for advice, and then installed our temporary service pole and our meter and panel for the shop: We also pounded in the indoor receptacles, and covered the attic vents with critter resistant mesh. We also passed our foundation wall inspection. And we took a load of construction debris to the dump. Also I think we saw a bear. Update. It was probably this particular bear. Our neighbors snapped this photo the next day, writing "Hello all, we just had a young visitor-a yearling cinnamon black bear."